2
Top: Binghamton before urban renewal.
Bottom: lots of vacant land, although a new Treadway Inn had been built along the river.
A later master plan indicating the cultural center and arena as actually built; redesign of the proposed commercial center south of the Episcopal church; but most significantly, proposals for higher density housing along the Susquehanna.
Model detail of the 1968 master plan with the ELS winning design in the middle; the recurring ladle-shaped building in front, and the Treadway Inn opposite the curved building.